Terms & Conditions · Happy Energy Surrey
Happy Energy Surrey home Working in partnership with Surrey County Council Back to the home page

Terms & Conditions

Happy Energy Solutions Ltd | Contract terms for self-funded customers

About these terms

These Terms & Conditions will apply if you choose to book a Home Energy Assessment with us, or to accept a quotation prepared by us, Happy Energy Solutions Ltd, for the supply and installation of one or more “Improvements” (meaning energy efficiency measures and/or renewable energy systems) at your property. They are intended for customers who are paying for the work themselves, from their own funds. In some cases part of the cost may be covered by a grant, such as the Boiler Upgrade Scheme (BUS) – see clause 11.5. These Terms & Conditions apply to each contract we make with you: the Assessment Contract, formed when you book your Home Energy Assessment, and the Installation Contract, formed when you accept our quotation. They tell you who we are, how we will provide our services to you, how you and we may change or end our contracts, what to do if there is a problem and other important information. Please read them carefully before confirming that you wish to proceed and tell us, before booking or accepting our quotation, if you think there is any mistake in them or in our quotation.

Who you are contracting with. Your contracts are with Happy Energy Solutions Ltd only. Surrey County Council endorses the scheme but is not a party to your contracts and does not guarantee them. Happy Energy Surrey is a trading name of Happy Energy Solutions Ltd.

Key facts

Key facts. This summary does not replace the full terms below, which apply to your contracts.

Who you are contracting withHappy Energy Solutions Ltd. Surrey County Council is not a party to your contracts.
Principal Designer and Principal ContractorWe design the work and act as principal designer and principal contractor under the Construction (Design and Management) Regulations 2015 (CDM). By accepting the Quotation you appoint us, and we carry out the CDM duties (clause 7.22).
Home Energy Assessment (HEA) Fee£195 including VAT, paid in advance when you book (clause 5.4). It includes lodging an EPC for the Property (clause 7.2). It is refunded in the cases in clause 5.5, may be refunded in the cases in clauses 5.9 and 5.10, and is not refunded in the cases in clauses 5.6 and 5.7.
Your cancellation rightsAssessment Contract: 14 days from the day you book. Installation Contract: from the day you accept the Quotation until 14 days after the last goods are delivered to your Property (clause 4.4).
Damage and what we are not liable forWe make good any damage we cause (clause 12.3). We are not responsible for existing faults in the Property unless our work makes them worse (12.3), for faults in your existing system that we could not reasonably have known about (12.1), for business losses (12.4), or for unauthorised use of scaffolding out of hours (12.5). Nothing limits our liability where the law does not allow it, such as death or personal injury caused by our negligence (12.2).
Deposit25% of the Net Price, paid before the PITI (clause 11.2). If we ask for further advance payments before installation, the Deposit and advance payments together will not exceed 60% of the Net Price (clause 11.4). All of these are held in a client account. Only your Deposit is also insured, by Qualitymark for 90 days. Advance payments are not insured (clause 11.3).
When you payDeposit within 14 days of accepting the Quotation. Advance payments on the dates in the Quotation. The balance is invoiced on Completion and is due within 14 days of the invoice (clause 11.7). You may not withhold payment because of a general concern or minor snagging, but your legal rights are not affected (clause 11.8).
Prices before a QuotationPrices on our website, in our marketing and from our online quote tools are indicative only. They are not an offer and may change. Your price is set when we issue a Quotation after the Home Energy Assessment, and it is fixed for the period the Quotation is valid. It can change if the Quotation has expired, or if the assessment, enabling or additional work, DNO requirements or a Grant change what your job needs (clauses 4.8, 6.2, 7.21 and 11.5).
GuaranteeAn insurance-backed workmanship Guarantee, plus the manufacturer’s guarantee. The length for each Improvement is in your Quotation and the Guarantee (clauses 10.2 and 10.3).
If something goes wrongTell us on 01483 981688 or at info@happyenergy.co.uk (clause 10.1). If we cannot resolve it, you can escalate it as set out in clauses 2.4, 2.5, 16.1 and 16.2.

1. Definitions and Interpretation

1.1In these Terms and Conditions, unless the context otherwise requires, the following expressions have the following meanings:

Assessment Contractmeans the contract between you and us for the Assessment Services, formed when you book the Initial Assessment and HEA and pay the HEA Fee (see clause 4.2)
Assessment Servicesmeans the Initial Assessment and the Home Energy Assessment (HEA)
Assessormeans a suitably qualified person appointed by us to carry out the Initial Assessment, the HEA and/or the PITI
Completionmeans the point at which the installation of the Improvement(s) is physically finished and the Improvement(s) is/are ready for use, even if minor finishing or snagging items remain to be put right
Contractmeans the Assessment Contract or the Installation Contract, as the context requires. Where these terms say “the Contract” without saying which, they apply to each of them, and a right to end the Contract ends only the contract it relates to, unless these terms say otherwise
Depositmeans the deposit described in clause 11.2
EPCmeans an Energy Performance Certificate for the Property, lodged on the government’s EPC register
Estimates Guidemeans our document “How We Estimate Generation, Running Costs and Savings”, which we give you with your energy report and your Quotation.
Formal Action Noticethe notice we send under clause 11.10.3 if the balance is overdue.
Grantmeans any grant, such as a Boiler Upgrade Scheme (BUS) grant, that the Quotation shows as applying to the cost of the Improvement(s) – see clause 11.5
Guaranteemeans the insurance-backed guarantee described in clause 10.2
HEA Feemeans the fee for the Initial Assessment and HEA, as shown to you when you book
Home Energy Assessment (HEA)means a full survey of the Property carried out by an Assessor to assess the Property and recommend suitable Improvement(s)
Improvement(s)means the particular energy efficiency measure(s) and/or renewable energy system(s) that we have agreed to supply and install under the Installation Contract, as described in the Quotation
Initial Assessmentmeans the first assessment of the Property by an Assessor, described in clause 5.1
Installation Contractmeans the contract between you and us for the Installation Services, formed when you accept a Quotation (see clause 4.2)
Installation Servicesmeans the supply and installation by us of the Improvement(s), as set out in the Quotation
MCSmeans the Microgeneration Certification Scheme – please see clauses 2.1 and 2.3 below for more information about this scheme and if it will be applicable to the Services
Net Pricemeans the Price less any Grant, as shown in the Quotation
PITImeans the Pre-Installation Technical Inspection: a detailed technical inspection of the Property carried out by us after you have accepted the Quotation and paid the Deposit, to confirm that the Improvement(s) can be installed as quoted
Pricemeans the total price payable for the Installation Services, including VAT and before the deduction of any Grant, as set out in the Quotation
Propertymeans the property where the Improvement(s) will be installed, the address of which is given in your booking and set out in the Quotation
Quotationmeans the relevant quotation (relating to the supply and installation by us of one or more energy efficiency measures and/or renewable energy systems) that we have prepared and made available for you to review and (if you are happy to do so) accept via our online quotation and booking system
RECCmeans the Renewable Energy Consumer Code – please see clauses 2.1 and 2.2 below for more information about this code and if it will be applicable to the Services
Servicesmeans the Assessment Services and the Installation Services
We/Us/Ourmeans Happy Energy Solutions Ltd, registered in England under number 08487950, whose registered address and main trading address is Unit 1, New Road, Perranporth, Cornwall, TR6 0DL.
You / Yourmeans you, the relevant customer named in your booking and (once issued) the Quotation, who by booking the Initial Assessment and HEA will be entering into the Assessment Contract with us and, by accepting a Quotation, the Installation Contract. If more than one person is named, see clause 7.20.

2. RECC & MCS Requirements – for Renewable Energy Systems (NOT applicable to other types of Improvement)

2.1Renewable Energy Consumer Code (RECC) and the Microgeneration Certification Scheme (MCS). Clauses 2.2 to 2.5 below will apply to any Services which involve the supply and installation of a renewable energy system.

2.2Renewable Energy Consumer Code (RECC). We are a RECC member. The aim of RECC is to guarantee a high quality experience for consumers wishing to buy or lease small-scale energy generation systems for their homes. The code (the “Code”) is backed by the Chartered Trading Standards Institute (CTSI) as part of a self-regulation initiative: the Consumer Codes Approval Scheme. Members of RECC agree to comply with the Code’s requirements. You can read the Code at recc.org.uk, and we will give you a leaflet describing it with your booking confirmation and again with your Quotation.

2.3Microgeneration Certification Scheme (MCS). The MCS specifies standards according to which particular kinds of renewable energy system should be installed. Under the MCS, only certified companies can enter into a contract with a customer for the sale and installation of a system. Our MCS Certification number is: NAP-32670. We will have an obligation to you under the Installation Contract to supply and install the relevant renewable energy system (as described in the Quotation) in accordance with relevant MCS standards.

2.4RECC dispute resolution procedure. If you have a complaint about the sale and installation of a renewable energy system, you must first raise it with us (see clause 15.1). If you are not satisfied with our final response, or you have not had a response within 10 working days of raising your complaint with us in writing, you can escalate it to RECC’s appointed alternative dispute resolution (ADR) provider, Green Homes Dispute Resolution, by registering a complaint. Details are at www.ghdr.org.uk. Green Homes Dispute Resolution is approved by the Chartered Trading Standards Institute as an ADR body. You may also wish to seek legal advice about taking court action.

2.5MCS complaints route. MCS (the Microgeneration Certification Scheme) is a single point of contact for complaints about MCS certified installations. If you have a problem with an MCS certified installation, tell us first (see clause 15.1) and give us a reasonable time to respond. If it is not resolved, you can complain to MCS using the online form at mcscertified.com, by email to mcscomplaints@mcscertified.com or by telephone on 0333 103 8130. If a resolution you both agree on cannot be reached through the MCS complaints process, MCS can refer eligible disputes to its ADR provider, the Dispute Resolution Ombudsman (operating as the Furniture & Home Improvement Ombudsman). Our MCS certification body is NAPIT (www.napit.org.uk).

3. Information about us and how to contact us

3.1Who we are. We are Happy Energy Solutions Ltd, a company registered in England. Our company registration number is 08487950 and our registered office is at Unit 1, New Road, Perranporth, Cornwall, TR6 0DL. Our registered VAT number is 204759703.

3.2Our insurance. We hold professional liability insurance and public and products liability insurance. Details of our cover, including the insurers, the limits of indemnity, their contact details and any limits to territorial coverage, are set out in our insurance information sheet, which is available on our website and on request.

3.3How to contact us. You can contact us by telephoning our Customer Service Team on 01483 981688, by writing to us at info@happyenergy.co.uk or Unit 1, New Road, Perranporth, Cornwall, TR6 0DL.

3.4How we may contact you. If we need to contact you, we will do so by telephone, text message, WhatsApp, Microsoft Teams (for example for video calls), or by writing to you at the email address or postal address you provided to us in your registration. We will use these methods for messages about your booking, Quotation, installation, payments and aftercare, and will not use them for marketing unless you have agreed. Please tell us if you would prefer us not to use a particular method, and tell us promptly if your details change. Notices that these terms say must be in writing will be sent by email or post. Please do not send us bank or card details by text message, WhatsApp or Teams.

3.5“Writing” includes emails. When we use the words “writing” or “written” in these terms, this includes emails.

4. Our contract with you & your cancellation rights

4.1How our process works. Our process for self-funded customers is as follows:

4.1.1you book and pay the HEA Fee, and an Assessor visits to carry out an Initial Assessment and, if it looks viable, a full HEA (see clause 5);

4.1.2we send you a Quotation for the Improvement(s) we recommend;

4.1.3if you accept the Quotation, the Installation Contract is formed and you pay the Deposit;

4.1.4we carry out the PITI and tell you the result. If the Improvement(s) can be installed as quoted, we agree an installation date with you;

4.1.5we install the Improvement(s) and, on Completion, you pay the balance of the Price; and

4.1.6we carry out the handover (see clause 7.11) and issue your Guarantee.

4.2How and when our contracts are formed. The Assessment Contract comes into existence between you and us when you book the Initial Assessment and HEA through our online booking system (or otherwise confirm your booking to us in writing) and pay the HEA Fee. It covers the Assessment Services only. If we recommend Improvement(s), we will send you a Quotation. The Installation Contract comes into existence when you accept the Quotation via our online quotation and booking system, and it covers the Installation Services. The Quotation is valid for the period stated in it. If you do not accept a Quotation, the Assessment Contract comes to an end once we have provided the Assessment Services. Each contract is made on these Terms and Conditions, and we give you the information required for each of them before it is formed.

4.3Our contracts are legally binding. Each contract is made up of these Terms and Conditions and, for the Installation Contract, the Quotation you have accepted. Once the Installation Contract has been formed, and subject to your cancellation rights in clause 4.4, you are legally bound by it, including your obligation to pay the Price in full as set out in clause 11.

4.4Your cancellation rights. If you change your mind after you have booked the Initial Assessment and HEA, you will have the right to cancel the Assessment Contract during the cancellation period, which starts on the day you book and ends 14 days after that day. If you accept a Quotation, you will have a further right to cancel the Installation Contract. That cancellation period starts on the day you accept the Quotation and ends 14 days after the day on which the last item of the goods is delivered to the Property. To cancel, you just need to tell us clearly that you want to cancel, by phone, email or post. You can also use the model cancellation form set out in Schedule 1 of these Terms and Conditions below, but you do not have to. If you cancel within a cancellation period we will refund any payments you have made to us for the services you have cancelled (subject to clause 4.5) within 14 days of you telling us of your decision.

4.5Asking us to start before the end of the cancellation period. We will only start carrying out any Services (including the Initial Assessment, the HEA, the PITI or any installation work) during a cancellation period if you expressly ask us to do so, on a durable record (for example by email, a saved online acceptance, or by signing the form in Schedule 2). We will show you the request (as a tick box in our online system, or as the Schedule 2 form) at the same time as the information about your right to cancel in clause 4.4 and Schedule 1, and before any work starts, and we will keep your request together with a note of why you asked us to start early. When you make that request:

4.5.1for the Assessment Services, you acknowledge that if we have fully performed them before the end of the cancellation period (for example, because we have completed the HEA), you will lose your right to cancel them;

4.5.2if you cancel the Assessment Services after we have started but before they have been fully performed, you must pay us an amount in proportion to what we have supplied up to the time you told us you were cancelling, compared with everything we agreed to supply, calculated on the price agreed or, if that price is excessive, the market value of the work done;

4.5.3for the Installation Services, you understand that if you cancel within the cancellation period after we have started installing, you may be responsible for the costs of the goods and services we have already supplied and of making good the Property, calculated in proportion to the full price agreed (or, if that price is excessive, the market value of the work done); and

4.5.4if we have already delivered anything to the Property before you cancel, you must return it to us (or allow us to collect it) in its original state, and we will refund any balance of your payments within 14 days.

4.6After the cancellation period. Once the cancellation period for the Installation Services has ended you no longer have a right to change your mind about them. If you ask to cancel after that, clauses 5.6 and 5.11 will apply.

4.7Putting your Quotation on hold. If the Property needs enabling or repair work, or asbestos needs to be removed, before we can install the Improvement(s) (see clauses 7.10.3 and 7.19), we can put your Quotation on hold while you complete it, for as long as the Quotation is valid. You must tell us when the work is complete and give us evidence if we ask, and we may need to repeat the PITI. If the Quotation has expired by the time you are ready to proceed, we will issue a new Quotation, and our prices may have changed. If the work is not complete by the end of the period for which the Quotation is valid, either of us may end the Installation Contract and clause 6.2 applies. You may also cancel at any time while the Quotation is on hold and apply again later, in which case we will issue a new Quotation. Your right to cancel during a cancellation period (clause 4.4) is not affected.

4.8Indicative prices. Any price, “from” price, estimate or example shown on our website, in our marketing, or produced by our online quote or price tool before we issue a Quotation is indicative only. It is based on the information you give us and our general costs. It is not an offer or a Quotation, and it is not a promise to supply the Improvement(s) at that price. Your price may be higher or lower, because it depends on the findings of the Initial Assessment and HEA, any enabling or additional work (clauses 6.2 and 7.19), any DNO requirements (clause 7.21), any Grant (clause 11.5), and the cost of products and labour when we issue the Quotation. Your price is the Price shown in the Quotation we issue after the HEA. A Quotation is valid for the period stated in it. If you accept it in that period, the Price is fixed as set out in the Quotation, subject to clauses 6.2 and 11.5. If it has expired, we may issue a new Quotation at a different price. If information you gave for an online quote was wrong or incomplete, clause 6.3 applies.

5. Assessments, surveys and inspections – HEA Fee, PITI and Deposit

5.1Initial Assessment. After you have booked and paid the HEA Fee, an Assessor will visit the Property to carry out an Initial Assessment, to check whether it looks viable for us to proceed to a full HEA and to install the type of Improvement(s) you are interested in.

5.2If the Initial Assessment shows it is not viable. If, following the Initial Assessment, we decide that it does not look viable to proceed, we will tell you, we will not carry out a full HEA and we will refund the HEA Fee to you in full within 14 days.

5.3Home Energy Assessment (HEA). If the Initial Assessment shows that it looks viable, the Assessor will proceed with the full HEA (on the same visit). Once the HEA is complete we will share the results and, if we are able to recommend suitable Improvement(s), a Quotation.

5.4The HEA Fee. You must pay the HEA Fee in advance, when you book. The HEA Fee is £195 including VAT. It is shown on our website and in your booking confirmation before you pay, and it is a charge you must pay to book. It includes lodging an EPC for the Property (see clause 7.2). If you accept a Quotation and the Services are completed, the HEA Fee will be deducted from the Price.

5.5When the HEA Fee will be refunded. We will refund the HEA Fee to you in full if:

5.5.1we decide, following the Initial Assessment, not to continue (see clause 5.2);

5.5.2we cancel the Assessment Contract (other than because you have failed to comply with it, see clause 9.2), or we are unable to carry out the Initial Assessment or HEA for a reason within our control, for example because we cancel or rearrange the appointment or an Assessor is unavailable;

5.5.3you cancel the Assessment Contract during the cancellation period before we have started the Initial Assessment or HEA (or, if we have started at your request, in line with clause 4.5).

5.6When the HEA Fee is not refundable. If we have carried out the Initial Assessment and/or HEA and you then decide not to go ahead, so that no Installation Services are completed, the HEA Fee will not be refunded (subject to your cancellation rights in clauses 4.4 and 4.5). This is because the HEA Fee pays for the time, expertise and costs of our Assessor, including lodging an EPC for the Property, whether or not you go on to buy Improvement(s) from us.

5.7If you are not at the Property for an appointment. If you (or another adult aged 18 or over) are not at the Property for an Initial Assessment, HEA, PITI or installation appointment we have arranged, or you cancel or rearrange it with less than 48 hours’ notice, the HEA Fee (in the case of the Initial Assessment or HEA) will not be refunded, and we may charge a cancellation fee of £195, which is stated in your booking confirmation and your Quotation. We will not charge a cancellation fee if you could not attend because of an emergency (for example illness, a bereavement or a family emergency) and you tell us as soon as you reasonably can. This clause does not affect your statutory right to cancel during a cancellation period under clause 4.4.

5.8The Deposit and the PITI. After you accept the Quotation you must pay the Deposit set out in clause 11.2. Once we have received the Deposit, we will carry out the PITI at the Property to confirm that the Improvement(s) can be installed as quoted. We will not start installation until the PITI has been completed and we have told you the outcome.

5.9If the PITI shows the Improvement(s) cannot be installed. If the PITI (together with our health and safety risk assessment) shows that the Improvement(s) cannot (or in our opinion, should not) be installed at all, because the site is not suitable or it is not technically viable, we will explain the reasons to you in writing and you will not be charged anything. We will end the Installation Contract and may refund the HEA Fee and will refund the Deposit to you in full within 14 days. If the PITI instead shows that additional work is needed, clause 6.2 applies.

5.10Design and changes to the Quotation. Before installation starts we will give you a final design for the Property. It will show where the main system will be installed, any alterations needed to the Property or to its electrical, heating or other services, any disruption to facilities or services that the installation may cause, and any work needed to put things right. You must approve the design before we start. If the final design, the Improvement(s) or the performance estimate differ from the Quotation, we will tell you in writing and you may cancel the Installation Contract with no penalty, in which case we will refund the Deposit and any advance payments in full within 14 days and, if the change comes from our own design, the PITI or our technical survey (and not from a change you have asked for), we may refund the HEA Fee as well. The same applies if you are not happy with an amended design.

5.11Cancelling after the PITI. If, after the cancellation period for the Installation Services has ended, you cancel the Installation Contract or do not go ahead (other than because we are in serious breach of the Contract, or clause 5.9, 5.10, 6.2 or 11.5 applies), we may keep from the Deposit the specific costs we have reasonably incurred in connection with your installation, such as the PITI, design work and any materials we have ordered that cannot be returned. The same applies if we end the Installation Contract under clause 11.14. We will not keep any sales or marketing costs, or any costs already covered by the HEA Fee, and we will refund the balance to you within 14 days, to the same payment method. The HEA Fee will not be refunded. If you cancel during the cancellation period, clauses 4.4 and 4.5 apply instead.

5.12If we cannot carry out or finish an assessment. If an Assessor attends but cannot carry out or finish the Initial Assessment, HEA or PITI because the Property, or part of it (for example the loft), is unsafe, cannot be accessed, or has not been made accessible as set out in clause 7.10:

5.12.1the Assessor may stop if they consider it unsafe to continue, and we will tell you in writing what needs to be done;

5.12.2once you have made the area safe or accessible, we will rearrange the visit once at no extra charge, and may charge a reasonable fee for any further visit;

5.12.3if the rest of the Property can be assessed, we may complete the HEA for those parts and tell you what we could not assess and how that may affect the Quotation; and

5.12.4the HEA Fee is not refunded where the reason is the condition of, or access to, the Property or something you have done or failed to do. We will refund it under clause 5.5 if the reason is within our control, or under clause 5.2 if we decide the Property is not viable.

6. Our rights to make changes

6.1Minor changes to the Services. We may change the Services in the following ways:

6.1.1by replacing a quoted product that is unavailable with a product of equal or better specification and warranty that is MCS certified (where this applies) and confirmed as compatible with the approved design, including exact model compatibility for inverters and batteries, provided that we tell you in writing before installation and you agree. If you do not agree, you may cancel the Installation Contract and we will refund the Deposit and any advance payments in full within 14 days;

6.1.2by making changes to reflect changes in relevant laws and regulatory requirements; and/or

6.1.3by making minor technical adjustments and improvements, as long as these will not affect your use of particular products to be provided as part of the Services.

6.2Where additional or enabling work is required. If we find faults, defects or other problems that we could not reasonably have been aware of before installation (including at the PITI), what happens next depends on the work that is needed:

6.2.1if it is enabling or repair work of the kind described in clause 7.19 (for example roof or structural repairs, windows or pest control), we will tell you in writing and you will need to arrange it with a contractor of your choice. We can put your Quotation on hold while the work is done, as set out in clause 4.7;

6.2.2if it is additional work that we can carry out as part of the Services, we will give you a quote for it. You may choose whether or not to accept the quote;

6.2.3if you decide not to accept a quote, if the enabling or repair work is not complete by the end of the period for which the Quotation is valid (see clause 4.7), or if you cancel while your Quotation is on hold, either of us may end the Installation Contract by giving the other written notice; and

6.2.4if the Installation Contract ends for any of these reasons and the Improvement(s) include a renewable energy system, we will refund your Deposit and any advance payments in full within 14 days, to the same payment method you used to pay us. In all other cases we may keep from your Deposit or other payments the specific costs we have reasonably incurred in connection with your installation, such as the PITI, design work and materials we have ordered that cannot be returned, but not sales or marketing costs or costs already covered by the HEA Fee, and we will refund the balance to you within 14 days, to the same payment method. Clause 5.6 applies to the HEA Fee.

6.3If the information we have been given is wrong. Our Quotation is based on the information you give us and the findings of the HEA. If we find that this information was wrong or incomplete, we may issue a revised Quotation, and clause 6.2 will apply if you do not accept it.

7. Providing the Services

7.1Our main obligations under our contracts. Under the Assessment Contract we have an obligation, subject to the matters set out in these Terms and Conditions, to carry out the Assessment Services. If you accept a Quotation, then under the Installation Contract we have an obligation, subject to the matters set out in these Terms and Conditions, to carry out the Installation Services by supplying and installing the Improvement(s) at the Property.

7.2Energy Report. As part of the Assessment Services, we will generate an energy report for the Property using the UK’s National Calculation Methodology for existing dwellings, Reduced data Standard Assessment Procedure (RdSAP). This methodology is used to assess the energy efficiency of existing dwellings which is calculated based on a dwelling’s heating, hot water and lighting usage. The report is provided as a representative example with approximate calculations and does not guarantee any particular energy performance rating, saving or outcome following the completion of the Services. Once the HEA is complete, we will lodge the RdSAP assessment as an EPC for the Property on the government’s EPC register, as set out in our Estimates Guide. We do this whether or not the Property already has an EPC, and whether or not you go on to accept a Quotation. The cost of lodging is included in the HEA Fee. An EPC lodged on the register is an official certificate and a public record that anyone can look up for the Property’s address. The new EPC will normally become the current certificate for the Property, so its rating may be different from any earlier EPC.

7.3Photos and information for your energy report. We will take photographs of the Property and ask you about your household (for example, about your heating system or how you use your home) to complete the HEA, the energy report and the EPC referred to in clause 7.2, and to meet our obligations under the MCS standards and (where a Grant applies) the scheme rules. See clause 13 for how we use this information.

7.4Estimates of savings and performance. Any estimate of energy savings, bill savings, payback period, carbon savings, system output or other performance that we give you (in the HEA, the energy report, the Quotation or otherwise) is prepared as set out in our Estimates Guide, which covers solar PV, batteries and heat pumps. For other measures, we state the method in the estimate. Your Quotation says which version of the Estimates Guide applies. Any such estimate:

7.4.1is an estimate only, and is not a guarantee of the results you will achieve;

7.4.2is given to you in writing before you accept the Quotation, is specific to the Property, and is based on your actual energy use and pattern of energy use where we have that information. It is calculated using the methods and assumptions set out in the Estimates Guide, which explains them and the sources they come from;

7.4.3where output varies through the year (for example solar PV or heat pumps), is a yearly figure and not a prediction for any particular day, month or season; and where we give an estimate of export income, will name the Smart Export Guarantee tariff we have assumed (to receive that tariff, you will need to apply to your energy supplier using your MCS certificate); and

7.4.4may differ from the results you actually achieve, because those depend on matters outside our control, including how you heat and use your home and the Improvement(s), occupancy, weather, shading, future energy prices and tariffs, and how the Improvement(s) are maintained. If we have agreed an output guarantee with you in writing, its terms (including the guaranteed level, how output is measured and how to claim) will be set out in that agreement.

7.5Your legal rights. Nothing in clause 7.4 affects your legal rights. Statements that you rely on when deciding to buy form part of your Contract, and we are responsible if an estimate was not prepared with reasonable care and skill or was false or misleading. The Estimates Guide explains how we prepare estimates. It does not change these Terms and Conditions or limit your rights. If there is a difference, these Terms and Conditions apply, unless the Estimates Guide gives you more favourable rights.

7.6Who will carry out the installation work as part of the Services. An approved sub-contractor from our network will carry out the installation work. All sub-contractors that we use are fully qualified and hold the relevant competent person qualifications for the measure they are installing. All works will be in line with the relevant consumer codes and/or standards relevant to the measure being installed. All approved sub-contractors carry identity cards which will be presented on their arrival. We will tell you the name of the sub-contractor, and describe the work they will do, in your Quotation before you accept it. We are responsible for the approved sub-contractors we use and for the work of any sub-contractor acting for us, and you should tell us if there are any problems.

7.7When we will commence providing the Services. Once the PITI has been completed and the Deposit has been paid, we will agree a start date with you (or a window of two or three days), confirmed in writing, and we will carry out work during normal working hours (8.30am to 5pm) Monday to Friday excluding bank holidays and public holidays unless otherwise agreed with you in writing. The start date or window we agree is part of the Installation Contract. Any completion date we give you is an estimate only. We will carry out the Services within a reasonable time, and this does not affect any right you may have to a price reduction under the Consumer Rights Act 2015 if we do not.

7.8We are not responsible for delays outside our reasonable control. If an event outside our reasonable control (for example severe weather, strikes that we are not directly involved in, delays by your Distribution Network Operator, or finding protected species such as bats at the Property) delays the Services, we will tell you as soon as we can and take reasonable steps to limit the delay, and we are not responsible for the delay. If there is a risk of substantial delay, you may end the Installation Contract and we will refund what you have paid for Services you have not received, within 14 days, to the payment method you used.

7.9If we need to change the start date. If we need to change the start date or window we have agreed, we will tell you as soon as possible and agree a new one with you. If we make a significant change to it (other than because of an event outside our reasonable control, to which clause 7.8 applies), you may cancel the Installation Contract and we will refund your Deposit and any advance payments in full within 14 days, to the payment method you used.

7.10What you will need to do before the Services can be completed. Before we can complete the Services:

7.10.1you must grant us, and our contractors, access to the Property for the purpose of carrying out the Initial Assessment, the HEA, the PITI and the installation;

7.10.2you must ensure that the area in which the Services will need to be performed is good, safe and free from all obstructions and you must comply with all reasonable requests we may make in order that the Services can be performed in accordance with our health & safety obligations;

7.10.3if we find or suspect asbestos or another dangerous material at the Property that prevents us from providing our Services safely, we will stop the affected work and tell you in writing. We do not instruct, arrange or carry out the removal of asbestos. You must instruct your own asbestos contractor, licensed where the law requires, and pay for the survey and removal. Our prices do not include this. Before we can continue you must give us the contractor’s written confirmation that the area is safe, including a ‘site clearance for reoccupation’ certificate where asbestos has been removed;

7.10.4before the work starts we will tell you in writing which floor coverings need to be lifted and whether they are likely to be damaged when lifted, even with care (for example tiles, glued or nailed hardwood, parquet or tongue-and-groove boards). You can lift them yourself, use your own specialist, or ask us to do it at the extra cost in the Quotation. We will photograph them before lifting. If we lift them, we are not responsible for the damage we told you to expect, or for refitting them, but we are responsible for any other damage we cause;

7.10.5where furniture or other items need to be moved in order for the Services to be carried out, you must arrange for these to be moved prior to our arrival and it is your sole responsibility to ensure that this is done safely. Except where caused by our negligence, we accept no liability for any injury sustained by you or any other person in connection with the moving of any items at the Property, whether or not any of our operatives are present or assist at your request, nor for any loss of, or damage to, any furniture, belongings or other items caused in connection with such moving. It remains your responsibility to ensure that any items you wish to protect are removed from the working area before we commence the Services;

7.10.6you must ensure that all areas in which the Services are to be carried out, including any external areas, are clean, safe and free from hazards prior to our arrival. This includes, but is not limited to, ensuring that any animal waste (including dog mess) has been cleared from all working areas, both inside and outside the Property. If our operatives arrive and find that a working area is not in a suitable condition to work safely, we reserve the right to postpone the Services until the area has been made safe and clean, and we may charge you for any additional costs incurred as a result of any such postponement.

7.10.7where the Services include loft insulation works, please make sure there is a clear path from your entrance door to the loft hatch, as our operatives will need to carry all materials in from a van and up into the loft. Please also make sure the area beneath the loft hatch is clear of furniture and possessions. You should NOT attempt to access the loft yourself, including to clear stored items, as the ceiling is fragile and there is a risk of serious injury. If you have items stored in the loft, our operatives will bring them down and place them in a room of your choice. We will photograph the loft and any stored items before we move them. Before the work starts we will tell you in writing if any items cannot be moved safely, or are likely to be damaged when moved because of their condition, size or weight, so that you can arrange for them to be moved by someone else. We are not responsible for that expected damage, or for damage to items already in poor condition, but we are responsible for any other damage we cause when moving them. Where loft boarding is present, we will tell you before the work starts if boards need to be lifted or removed, and that some boards may split or break when lifted, even with care. We are not responsible for that damage or for refixing the boards, unless the Quotation says we will refix them;

7.10.8if you are a tenant, you must obtain your landlord’s permission in writing before you allow us to start the work, and you must provide us with evidence that you have obtained this permission. If we carry out work at the Property and you have not gained permission, or have given us false or inaccurate information, you will be required to compensate us for any losses we suffer as a result;

7.10.9you must have the legal right to have the Improvement(s) installed at the Property, including the consent of any co-owner, freeholder, management company or mortgage lender whose consent is needed;

7.10.10if the Property is a listed building, in a conservation area or otherwise protected, you must tell us if you know or think that it is, and you are responsible for getting any planning, listed building or other permission needed before we start work and for giving us evidence of it. This applies whether or not you knew about the status when you booked. As part of the HEA we will check the Property’s listing and conservation area status using publicly available records, and we will tell you in writing if we find that permission may be needed. We cannot start work until you have the permission and have given us evidence of it. If we find out after you have accepted the Quotation, clause 6.3 applies and we are not responsible for any delay caused by waiting for permission. If you knew, or ought reasonably to have known, that the Property is protected and you did not tell us, you must compensate us for the reasonable and foreseeable losses we suffer as a result, which may include fines and penalties we are required to pay;

7.10.11where relevant to a particular type of Improvement, you must ensure there is an adequate supply of water and electricity (and gas if this is normally supplied) to the Property to enable us to commission the Improvement(s);

7.10.12a person aged 18 or over must be present at the Property for the full duration of each visit (including any survey, technical inspection, or installation visit). If no one meeting this requirement is present when we or our contractors arrive, we may need to postpone the visit, and may charge you for any additional costs this causes.

7.11Commissioning and handover. When the installation is complete we will test and commission the system in line with the MCS standards (where they apply) and record the results on a commissioning record, signed on our behalf, a copy of which we will give you. We will promptly give you the handover documents: operating and maintenance instructions, a full description of the system, details of all the guarantees in place, the MCS certificate (where your system is MCS certified), any compliance certificates, including proof of notification to your network operator where it applies, an invoice for the payments you have made and, where CDM requires one, the health and safety file. We will give you these documents whether or not you have paid in full. We will also explain how to use any new equipment. Where required under the MCS standards or agreed in the Quotation, we will also carry out a post-installation inspection to check the quality of the completed work. You must give us access to the Property for this, and to put right any defect it identifies, provided we have given you reasonable notice and any visit is scheduled within normal working hours.

7.12Servicing and maintenance. Before you accept the Quotation we will tell you whether the Improvement(s) need regular servicing or maintenance, what this is likely to cost, and whether it affects your Guarantee.

7.13Extra support. If you need extra support, or would like anything explained in a different way, please tell us. You are welcome to have a trusted friend or relative with you at any visit and when you read your Quotation and Contract. If you would like this, we will rearrange the visit for a time when they are available.

7.14People in your home. Please tell us before any visit if anyone living in, or regularly visiting, the Property may be vulnerable or need extra care while we work. This includes, for example, children, older people, or anyone with a medical condition, disability or mobility need, or who depends on heating, hot water, electricity or medical equipment. You only need to tell us what we need to know to plan the work safely and considerately. We will use this information to plan our visits and, where we can, adjust the timing or the way we work, and we will handle it in line with clause 13.1. Please also tell us if anything changes before or during the work.

7.15If you do not allow us access to provide the Services. If you do not allow us access to the Property to perform the Services as arranged (and you do not have a good reason for this) we may charge you additional costs incurred by us as a result, and we reserve the right to charge a cancellation fee in line with clause 5.7. If, despite our reasonable efforts, we are unable to contact you or rearrange access to the Property we may end the Contract in line with clause 9.2.

7.16Delivery and storage of products. Where products and materials are delivered to, or stored at, the Property for the purposes of providing the Services you will not be responsible for inspection, storage or handling of these products or materials. This does not preclude us asking you to check them for any visible damage, and to ensure they appear to be of the correct type.

7.17If a Contract ends early. If the Contract is cancelled or otherwise comes to an end early for any reason, then we will make arrangements with you to collect any relevant products or other materials already delivered to the Property but not yet installed at the Property. If you do not make adequate and reasonable arrangements with us to allow these products/materials to be collected, we retain the right to take legal proceedings to recover them or their value from you.

7.18What will happen if you do not give required information to us. We may need certain information from you so that we can provide the Services to you, for example, details of your electricity supply or confirmation of any consents. If so, this will have been notified to you before you accepted the Quotation. We will contact you to ask for this information. If you do not give us this information within a reasonable time of us asking for it, or if you give us incomplete or incorrect information, we may either end the Contract in line with clause 9.2 or make an additional charge of a reasonable sum to compensate us for any extra work that is required as a result. We will not be responsible for a delay in providing the Services or failure to provide them (or part of them) insofar as this is caused by you not giving us the information we need within a reasonable time of us asking for it.

7.19Enabling and repair works. The Price covers only the Improvement(s) described in the Quotation. It does not include roof repairs, structural repairs, replacing or repairing windows and doors, pest control, or similar work to the Property that needs doing before or after the installation. If the HEA or PITI shows that this kind of work is needed, we will tell you in writing and you will need to arrange it with a contractor of your choice. We can suggest local contractors, but we are not responsible for their work. We do not arrange asbestos removal. If asbestos is identified you must use your own asbestos contractor (see clause 7.10.3). The cost of the Safe Isolation Protection (SIP) switch is included in the Price for all installations, and we will arrange it, so you do not need to. We can hold your Quotation while the work is done (see clause 4.7).

7.20Landlords and joint owners. If the Property is let, or you are buying the Improvement(s) as a landlord or in connection with a business, we give you the same rights under these Terms and Conditions (including the cancellation rights in clause 4.4) whether or not the law treats you as a consumer. You must tell us before the HEA if the Property is let and who lives there. You are responsible for getting your tenants’ agreement to the work and to access for visits, for making sure an adult is present at each visit as set out in clause 7.10, for telling your tenants about the work and what to expect, and for giving them the operating instructions and safety information we provide at handover. If two or more people own the Property, each of you who is named in the booking or the Quotation is bound by the contracts and is responsible, together, for all of their obligations, including payment. We may take instructions from, and give notices to, any one of you, and a notice to cancel given by one of you is treated as given by all of you. The person who accepts the Quotation confirms that they have the authority of all owners to do so.

7.21Network connection (DNO). Solar PV, batteries and some heat pumps must be notified to, or approved by, your local Distribution Network Operator (DNO). You authorise us to make the notification or application on your behalf and to share the information needed with the DNO. Approval can take time, and the DNO may limit the amount you can export or require a network upgrade (for example a new main fuse or service cable). Any charge the DNO makes for an upgrade to its network connection associated with the installation is included in the Price, unless the Quotation says otherwise. We will tell you as soon as we know whether an upgrade is needed, because it may affect when we can install (see clause 7.8). If the Property has a looped or shared electricity supply (for example where the supply is shared with a neighbouring property), or the DNO limits or does not allow export, we may need to fit equipment that limits or prevents export, or the DNO may require changes to your supply before we can connect. If your system has to be set to zero export, it cannot send electricity to the grid, so you will not be able to claim payments under the Smart Export Guarantee (SEG), and any estimate of export income will not apply. We will tell you in your Quotation if we already know this applies. If we find out after you have accepted the Quotation, we will tell you in writing and revise the performance estimate. Clause 5.10 (design and changes to the Quotation) then applies, so you may cancel and receive a full refund of your Deposit and any advance payments.

7.22Principal Designer, Principal Contractor and CDM duties. The Construction (Design and Management) Regulations 2015 (CDM) apply to the work. We design the Improvement(s) and carry out the installation through our approved installers. By accepting the Quotation you appoint us as the principal designer and the principal contractor for the work described in the Quotation (or, if we are the only designer and contractor, as the designer and contractor), and we will carry out the duties CDM places on us in those roles. These include planning, managing and monitoring the pre-construction and construction phases and their health and safety, and preparing a health and safety file where CDM requires one. If you are a domestic customer, this includes the duties CDM passes from you to us. You must give us any information you have that could affect the safety of the design or the work, such as asbestos surveys, structural or electrical information and known hazards at the Property (see clause 7.10). You must tell us before you appoint any other designer or contractor to work at the Property in a way that affects our work, and we will coordinate our work with theirs. If you are not a domestic customer (for example you are a landlord or business), your client duties under CDM remain yours. This clause is your written appointment of us as principal designer and principal contractor, and you must give us the information, time and resources we reasonably need to carry out our roles.

7.23Neighbours’ consent. Some access or work, such as scaffolding or installation work, may need your neighbour’s consent, for example if it needs access over, or work on or near, a neighbour’s land or property or a shared or party wall, boundary, roof, drain or service. You are responsible for getting that consent and for any cost of doing so, and for giving any notice the law requires. If we identify that consent may be needed, we will tell you in writing and send you our Neighbour Consent Form. You must complete the form and confirm that you have obtained consent, and return it to us before that part of the work starts. We will not start the affected work until we have the completed form. If the form is not returned within a reasonable time, or your neighbour refuses or withdraws consent, we may put your installation on hold and clause 7.18 applies as if you had not given us information we asked for.

8. Your rights to end the Contract

8.1You have changed your mind and cancel during a cancellation period. Please see clause 4.4 above for more details about your cancellation rights in these circumstances.

8.2Additional work is required, and you do not accept our quote for this. Please see clause 6.2 above for more details about your right to end the Contract in these circumstances.

8.3Substantial delay caused by circumstances beyond our reasonable control. Please see clause 7.8 above for more details about your right to end the Contract in these circumstances.

8.4We make a significant change to the agreed start date or window. Please see clause 7.9 above for more details about your right to cancel in these circumstances.

8.5The design or performance estimate differs from the Quotation. Please see clause 5.10 above for more details about your right to cancel in these circumstances.

8.6The PITI shows the Improvement(s) cannot be installed. Please see clause 5.9 above for more details about what happens in these circumstances.

8.7Any product supplied as part of the Services is faulty or misdescribed. In these circumstances, you may have a legal right to end the Contract (or to get the relevant product repaired or replaced or a relevant service re-performed or to get some or all of your money back) – please see clause 10 below for more details.

8.8We have failed to comply with the Contract in a serious way. If we fail to comply with the terms of this Contract in a serious way and do not then take, within a reasonable period of time specified by you, any steps which, acting reasonably, you ask us to take to rectify that failure, you will have a right to end the Contract by telling us that you wish to do so. In these circumstances, you may also be entitled to receive some compensation from us if you have suffered some loss as a result of us not complying with the Contract and you ending the Contract for this reason.

9. Our rights to end the Contract

9.1Additional work is required, and you do not accept our quote for this. Please see clause 6.2 above for more details about our right to end the Contract in these circumstances.

9.2You have failed to comply with the Contract in a serious way. We will have the right to end the Contract by telling you that we wish to do so if any of the following reasons apply:

9.2.1you do not pay the balance of the Net Price, or any other amount due under clause 11 (other than the Deposit and any advance payment, which clauses 11.13 and 11.14 deal with), and you still have not paid by the end of the period given in our Formal Action Notice under clause 11.10;

9.2.2you do not, within a reasonable time of us asking for it, provide us with information that is necessary for us to provide the Services;

9.2.3you do not, within a reasonable time specified by us, allow us access to the Property to provide the Services; or

9.2.4you fail in any other respect to comply with the Contract in a serious way and do not then take, within a reasonable period of time specified by us, any steps which, acting reasonably, we ask you to take to rectify that failure.

9.3You must compensate us if you fail to comply with the Contract. If we end the Contract for any of the reasons set out in clause 9.2 above, we may charge you reasonable compensation for the net costs or losses we will incur as a result, including the costs described in clause 5.11.

10. If there is a problem with the Services (including any product or other goods supplied as part of the Services)

10.1How to tell us about problems. We will always strive to be fair and reasonable. Should you ever feel that we have failed to honour our promise, we will seek to ensure that your complaint is dealt with quickly and fairly. The easiest way to complain is simply to give us a call on 01483 981688. If you wish to write, please write to the Customer Service Team, Happy Energy Solutions Ltd, Unit 1, New Road, Perranporth, Cornwall, TR6 0DL, or email info@happyenergy.co.uk. We will investigate any problem you tell us about and put right anything that we are responsible for in line with these terms and your legal rights. Raising a problem does not by itself change when a payment is due (see clause 11.8).

10.2Your insurance-backed guarantee. In addition to your rights under this Contract, we also provide a separate insurance-backed guarantee in relation to the Services (the Guarantee). Any rights you have under the Guarantee are entirely separate to, and supplement, your rights under this Contract. The Guarantee protects the quality of our workmanship after Completion; protection for money you pay us before Completion is described in clause 11.3. The Guarantee is insurance-backed so that it will be honoured for its full term even if we stop trading, and its length for each Improvement is stated in your Quotation and in the Guarantee. We will provide you with a copy of the Guarantee terms and conditions, and you can ask us for another copy at any time.

10.3Manufacturers’ guarantees. We will give you, at no extra cost, the manufacturer’s guarantee against manufacturing faults for the goods we supply, and we will explain its terms and period of validity to you clearly in plain English, both in writing and verbally. Where the manufacturer is based outside the UK, we will give you the details of the importer or distributor who will take on the manufacturer’s responsibilities if there is a fault. Manufacturers’ guarantees do not limit your legal rights under the Consumer Rights Act 2015 or other legislation.

10.4Your rights under the Consumer Rights Act. You also have legal rights under the Consumer Rights Act in relation to the Services we provide under this Contract. These rights are separate to any additional rights you may have under the Guarantee. Please see the box below for a summary of rights and remedies you may have under the Consumer Rights Act.

Your rights under the Consumer Rights Act

Below is a summary of some of the rights you may have under the Consumer Rights Act 2015 in relation to this Contract. These are subject to certain exceptions. For detailed information please visit the Citizens Advice website www.citizensadvice.org.uk or call 0808 223 1133 (Relay UK 18001 0808 223 1133).

If we install goods, for example a boiler, the Consumer Rights Act says those goods must be as described, fit for purpose and of satisfactory quality. If the goods fail to meet any of these standards, your legal rights may entitle you to the following:

  • to reject any faulty or misdescribed goods within 30 days of the date they were installed; or
  • to have your goods repaired or replaced if you tell us they are faulty or not as described within six months of the installation date.

After six months, you may still be entitled to a repair, replacement or price reduction for up to six years if you can show the goods were not as described, fit for purpose and of satisfactory quality on the installation date.

For the services we provide, for example the installation of a boiler, the Consumer Rights Act 2015 says:

  • You can ask us to repeat or fix a service if it’s not carried out with reasonable care and skill, or potentially get some money back (if applicable) if we can’t fix it.
  • If you haven’t agreed a time upfront, the services must be carried out within a reasonable time.

10.5Determining whether the goods we installed were faulty or not as described. Your rights under the Consumer Rights Act depend on whether the goods conformed to the Contract when they were installed. If a fault appears within six months of installation, it is presumed that the goods were faulty when installed, unless we can show otherwise. If a fault appears more than six months after installation, you may need to show that the goods were faulty or not as described when installed. This does not affect your rights in relation to any goods that are covered by the Guarantee.

10.6Rejected goods. If you exercise your legal right to reject goods we have installed, we will arrange and pay for their removal and make good the Property. If goods have been delivered but not yet installed, we will arrange and pay for their collection.

11. Price and payment

11.1Where to find the price for the supply and installation. The Price (which includes VAT) will be as indicated in the Quotation. The Quotation will also show any Grant deducted, the Net Price, the Deposit, any further payments and the balance due on Completion.

11.2Deposit. After you accept the Quotation you must pay a Deposit of 25% of the Net Price (or a lower amount if the Quotation says so) within 14 days of accepting it, and before we carry out the PITI. If you have not paid the Deposit within 30 days of accepting the Quotation, clause 11.13 applies. If you cancel the Installation Services within the cancellation period (please see clauses 4.4 and 4.5 above), the Deposit will be returned to you within 14 days, less only any amount we are entitled to charge under clause 4.5. In all other cases clauses 5.9 and 5.11 apply.

11.3Protection of your Deposit and advance payments. Your Deposit and any advance payment you pay to us are held in a separate client account, ring-fenced from our own business accounts (including any account linked to our own credit or banking facilities) and from our other creditors. Money is only released from that account to pay for goods and work carried out under your Installation Contract, with your consent given when you accept the Quotation. Only your Deposit is also insured by Qualitymark Protection Ltd, for 90 days from the date we receive it. Advance payments are not insured by Qualitymark and are protected by the client account only. If we become insolvent or cease to trade within that 90 days before your Installation Contract is completed, this insurance means that your Installation Contract can be completed by another installer at no additional cost to you, or your Deposit refunded, in line with the policy terms. We will give you your Qualitymark Protection certificate when we receive your Deposit.

11.4Advance payments. The Quotation will explain the amount and timing of each payment. After you approve the final design under clause 5.10, we will ask for an advance payment (normally 35% of the Net Price). It is due 14 days after our request or, if later, three weeks before the goods are due to be delivered. Your Deposit and advance payments together will never exceed 60% of the Net Price, and we will refund any excess if the Price is reduced. We will confirm your installation date once we have received the payment (see clause 11.14 if it is not paid).

11.5If a Grant applies. Some Improvements may qualify for a Grant, such as the Boiler Upgrade Scheme (BUS). A Grant is a discount on the Price. Where the Quotation says a Grant applies, it will show the Price, the amount of the Grant deducted and the Net Price you pay, and the Deposit, advance payments and balance described in clause 11 are calculated on the Net Price. If the Grant is essential to your decision to go ahead, the Quotation will say so and the Installation Contract is conditional on the Grant being awarded. Where a Grant applies:

11.5.1the Grant is paid by the scheme administrator (for BUS, Ofgem), and whether you are eligible, and whether and when the Grant is awarded, is decided under the scheme rules and not by us. Before we apply, we will give you in writing information about the source of the Grant and its terms and conditions. We will apply for the Grant on your behalf, and you authorise us to do so and to share the information needed with the scheme administrator. For BUS, Ofgem will contact you to ask for your consent to our application, and you must respond promptly;

11.5.2you must give us complete and accurate information (including about who owns the Property) and tell us promptly if anything changes. You must also sign promptly any declaration or completion paperwork the scheme requires, even if minor snagging remains outstanding. If you have any concern about the work you should raise it with us in line with clause 10.1, and we will deal with it;

11.5.3if, before we begin the installation, the Grant is refused, reduced or withdrawn, or the funding is no longer available, we will tell you. You may then either pay the higher amount or end the Installation Contract. If you end the Installation Contract, we will refund your Deposit and any advance payments in full within 14 days, and clause 5.6 will apply to the HEA Fee; and

11.5.4if the Grant is refused, reduced, withdrawn or recovered after we have begun the installation because you gave us inaccurate or incomplete information, do not meet the scheme rules, or withdraw your consent, you must pay us the amount of the Grant that we do not receive. If it is reduced for any other reason, we will not charge you the difference.

11.6Extra works. In the event that faults in your existing system occur following the installation of the products and these faults have not been caused by anything we have done wrong under the Contract, you have the following options:

11.6.1request that we perform the extra works at an extra cost of £150 per hour (inclusive of VAT) together with any costs relating to additional equipment required; or

11.6.2arrange for your own engineer to attend and complete the extra works.

11.7When you must pay and how you must pay. You must pay each amount by the date stated in the Quotation or, if it states none, as follows:

11.7.1the Deposit: within 14 days of you accepting the Quotation, and before we carry out the PITI;

11.7.2any advance payment: 14 days after our request or, if later, three weeks before the goods are due to be delivered; and

11.7.3the balance of the Net Price: within 14 days of the date of our invoice. Unless the Quotation says otherwise, we will invoice the balance on Completion.

We accept payment by bank transfer, debit and credit cards.

11.8You must pay us on time. You may only withhold a fair amount for a clearly identified defect. You must pay each amount due under the Contract in full and on time. You may not withhold, delay or deduct any payment because you have a general concern, query or complaint about the Services or the way they have been carried out, or because minor snagging, finishing or remedial items are outstanding. Minor snagging or finishing items do not delay Completion or the date payment is due. If you have a concern, please tell us promptly (see clause 10.1) and we will investigate it and put right anything we are responsible for in line with these terms and your legal rights. Nothing in this clause limits or removes any legal right you have, including your rights under the Consumer Rights Act 2015 (for example to a repair, replacement, price reduction or refund), your rights under the Guarantee, and any legal right you have to withhold, reduce or set off a payment. If you intend to withhold or reduce a payment because you are relying on one of your legal rights, please tell us in writing before the payment is due, explain why and tell us the amount, so that we can respond. If we disagree, clause 15 applies. If it turns out you were not entitled to withhold an amount, you must pay it within 14 days of the outcome, and interest may be charged under clause 11.9 from the original due date. Paying us does not give up any of your legal rights, and we will refund any amount that it later turns out you should not have paid. This clause does not apply to an amount that is not due under the Contract (see clause 11.12).

11.9We can charge interest if you pay late. If you do not make any payment to us by the due date (other than an amount you are entitled to withhold under clause 11.8), we may charge interest to you on the overdue amount at the rate of 2% a year above the base rate of the Bank of England from time to time. This interest will accrue on a daily basis from the due date until the date of actual payment of the overdue amount, whether before or after judgment. You must pay us interest together with any overdue amount. We may also suspend any further work until payment is received, and recover from you our reasonable costs of recovering the overdue amount.

11.10If a payment is late. We will remind you about each payment. The Day counts below run from the date we send our invoice or request for payment (for the Deposit, from the date you accept the Quotation). If you do not pay an amount by its due date (other than an amount you are entitled to withhold under clause 11.8), we will follow these steps:

11.10.1For the Deposit: on Day 5 we will send a reminder, and on Day 15 an overdue reminder asking you to pay within 7 days. Clause 11.13 then applies;

11.10.2An advance payment: on Day 5 we will send a reminder; on Day 15 an overdue reminder, and on Day 21 a second overdue reminder, each asking you to pay within 7 days; and on Day 28 a further notice that we must receive payment within 90 days of our request. Clause 11.14 then applies;

11.10.3Remaining Balance: on Day 5 we will send a reminder; on Day 15 a first overdue reminder confirming the amount due, the interest that is building up under clause 11.9 and the steps we may take under clause 11.11; on Day 21 a second overdue reminder with our Formal Action Notice, which sets out the amount due, includes the information required by the Pre-Action Protocol for Debt Claims, and gives you at least 30 days from its date to pay, to agree a payment plan with us, or to tell us if you dispute the debt; and on Day 28 a final reminder asking you to pay within 2 days. We will not start court proceedings before the period in the Formal Action Notice has ended; and

11.10.4If you tell us at any stage that you are having difficulty paying, or that you dispute the amount, we will consider what you tell us and will not take the next step while we do so, provided you reply within the time we give you.

11.11What we can do if you still do not pay. If the amount is still unpaid when the period in the Formal Action Notice has ended, and you have not agreed a payment plan with us, we may:

11.11.1charge interest under clause 11.9 and recover our reasonable costs of recovering the amount;

11.11.2suspend any further work or services due under the Contract; and

11.11.3start court proceedings to recover the amount due, interest and court fees (after following clause 16.3, so that if you have raised a complaint about the work we will finish our complaints process first), or pass the debt to a debt collection agency.

11.12What to do if you think an invoice is wrong. If you think an invoice is wrong, please contact us promptly to let us know. As long as you have acted reasonably in raising a dispute about an invoice, you will not have to pay any interest on the disputed amount until the dispute is resolved. Once the dispute is resolved we will charge you interest on correctly invoiced sums from the original due date.

11.13If the Deposit is not paid. Until we receive the Deposit, we will not carry out the PITI or take any other step on your installation. If you have not paid the Deposit within 30 days of accepting the Quotation, and we have not agreed a later date with you in writing, your Quotation is put on hold and we may end the Installation Contract by telling you in writing. If you still want to go ahead, we will issue a new Quotation, and our prices may have changed. This does not affect your right to cancel under clause 4.4. Clauses 9.2 and 9.3 do not apply to this clause.

11.14If an advance payment is not paid. Until we receive an advance payment we will not confirm your installation date, order goods for your installation or deliver them, and your installation is on hold. If we have not received it within 90 days of our request, we may end the Installation Contract by telling you in writing. Clause 5.11 then applies as if you had cancelled after the PITI: we may keep from the Deposit the specific costs we have reasonably incurred, we will give you a written breakdown, and we will refund the balance within 14 days. Clause 9.3 applies to any reasonable costs above the Deposit.

11.15Risk and ownership of the goods. Goods are at your risk once they are delivered to the Property. Ownership of the goods passes to you when you have paid for them in full, except that where goods are bought with your Deposit or an advance payment and delivered to us before installation, clause 11.16 applies.

11.16Goods bought with your Deposit or advance payments. If we use your Deposit or an advance payment to buy goods that are delivered to us before they are installed at the Property, we will hold those goods on trust for you, keep them separate from our own stock and other customers’ goods, insure them, identify them as your property and allow you to inspect them. Ownership of those goods passes to you in proportion to the amount you have paid.

11.17How we make refunds. Where these terms say we will refund you, we will refund you using the payment method you used to pay us, unless you agree otherwise, and we will not charge you a fee for doing so.

12. Our responsibility for loss or damage suffered by you

12.1We are responsible to you for foreseeable loss and damage caused by us. We are responsible for loss or damage you suffer that is a foreseeable result of our failing to comply with the Contract or our failing to use reasonable care and skill. Where we connect new products to your existing system, we cannot accept responsibility for the cost of repairing or replacing parts of your existing system that later develop faults, or compensating you for any faults, unless we have been negligent in not realising that this damage to your existing system would happen or unless the way we carried out the work was negligent and caused the fault. The faults concerned are those that:

12.1.1already existed in your existing system, prior to the installation of the new product; such faults may have been identified in the PITI;

12.1.2we could not reasonably have been aware of prior to the installation, including faulty pipework which was not visible on a simple inspection or survey; or

12.1.3are a result of inadequate or varying water supply to the new product.

12.2We do not exclude or limit in any way our liability to you where it would be unlawful to do so. This includes liability for death or personal injury caused by our negligence or the negligence of our employees, agents or sub-contractors; for fraud or fraudulent misrepresentation; for breach of your legal rights in relation to the products as summarised at clause 10.4 and for defective products under the Consumer Protection Act 1987.

12.3When we are liable for damage to your property. If we are providing Services in the Property, we will make good any damage to the Property caused by us while doing so. Making good means filling and sealing holes, chases and openings we have made, and leaving the surface ready for decoration. Unless the Quotation says otherwise, it does not include redecoration, such as painting, wallpapering or tiling, of the areas we have made good. Before the work starts the Quotation will tell you where we expect to make holes, chases or openings, so you know what redecoration you may need to arrange. We are not responsible for any existing faults or defects relating to the structure, plumbing, electrics, heating or any other part of the Property, unless our work makes them worse.

12.4We are not liable for business losses. We only supply products and services for domestic and private use. If you use the Services (including any products supplied by us as part of the Services) for any commercial, business or re-sale purpose we will have no liability to you for any loss of profit, loss of business, business interruption, or loss of business opportunity which you may suffer as a result of our negligence or failure to comply with the Contract.

12.5Scaffolding. If scaffolding is required to install any Improvement, we cannot be held responsible for any unauthorised use of the scaffolding out of normal working hours when our installers are not on site.

13. How we may use your personal information

13.1How we may use your personal information. We will only use your personal information as set out in our privacy notice, which is available on our website and will have been sent to you by email or post. It explains what we collect, including the photographs and household information we collect under clause 7.3, who we share it with and why. The EPC we lodge for the Property under clause 7.2, which includes the Property’s address and the results of the assessment, is published on the government’s EPC register and can be seen by the public. Because we are a RECC member, information about you may also be passed to the Code Administrator (Renewable Energy Assurance Ltd) and its auditors as part of monitoring our compliance with the Code, and the Code Administrator may contact you directly. We will give you RECC’s Use of Personal Data Notice when we collect your information.

13.2Monitoring of your equipment. Some equipment we install, such as air source heat pumps, solar PV systems and batteries, includes remote monitoring so that we can check it is working properly, spot faults early and help you get the best from it. This may include how much electricity your solar PV system generates and how your battery charges and discharges. Where monitoring applies, we will tell you in your Quotation and in our separate monitoring terms, which explain what information we collect (for example performance data from the equipment and, where you agree, readings from your smart meter), how we use it, who we share it with and how long we keep it. You can opt out of monitoring at any time by contacting us, and opting out will not affect the Services.

14. Other important terms

14.1We may transfer the Contract to someone else. We may transfer our rights and obligations under the Contract to another organisation. We will always tell you in writing if this happens and we will ensure that the transfer will not affect your rights under the Contract.

14.2You need our consent to transfer your rights or obligations under the Contract to someone else (except that you can always transfer our Guarantee). You may only transfer your rights or your obligations under the Contract to another person if we agree to this in writing. However, you may transfer the Guarantee to a person who has acquired the Property. We may require the person to whom the Guarantee is transferred to provide reasonable evidence that they are now the owner of the Property.

14.3Nobody else has any rights under this Contract (except someone you pass your Guarantee on to). This Contract is between you and us. No other person will have any rights to enforce any of its terms, except as explained in clause 14.2 in respect of the Guarantee. Neither of us will need to get the agreement of any other person in order to end the Contract or make any changes to these terms.

14.4If a court finds part of this Contract illegal, the rest will continue in force. Each of the clauses of these Terms and Conditions operates separately. If any court or relevant authority decides that any of them are unlawful, the remaining clauses will remain in full force and effect.

14.5Even if we delay in enforcing this Contract, we can still enforce it later. If we do not insist immediately that you do anything you are required to do under the Contract, or if we delay in taking steps against you in respect of your having failed to comply with the Contract, that will not mean that you do not have to do those things and it will not prevent us taking steps against you at a later date. For example, if you miss a payment and we do not chase you, but we continue to provide the Services, we can still require you to make the payment at a later date.

14.6Which laws apply to this Contract and where you may bring legal proceedings. The Contract is governed by English law, and you can bring legal proceedings in respect of the Services in the English courts.

15. Complaints process

15.1Making a complaint. If you have a complaint, please tell us in writing (including by email) as soon as possible after you notice a problem, using the contact details in clause 10.1. We will make a record of your complaint and keep it updated throughout.

15.2What we will do. We will consider your complaint and report our findings to you in writing within 10 working days of being notified. If appropriate, we will arrange to inspect your system within 5 working days of being notified, and within 24 hours if you are without heating or hot water as a result of the problem. We will try to agree a course of action to resolve your complaint quickly and effectively, to your satisfaction.

15.3Our final response. At the end of our investigation we will give you a written final response setting out the outcome of the investigation, an explanation of whether something went wrong and what impact it had, the action we intend to take (if any), confirmation that this is the end of our complaints process, and details of how to escalate your complaint if you are not happy with our response.

15.4If you are not satisfied. If you are not satisfied with our final response, or you have not had a response within 10 working days of raising your complaint with us in writing, please see clause 16.1 (renewable energy systems and the MCS installer standards) or clause 16.2 (all other work) for how to escalate it.

15.5If we do not uphold your complaint. If we do not uphold your complaint, our final response will explain why and how to escalate it (see clauses 15.3 and 15.4). While your complaint is being considered by us or by an ADR provider, you must continue to pay amounts that fall due, apart from any amount you are entitled to withhold under clause 11.8, allow us and the ADR provider reasonable access to the Property to inspect and, if agreed, carry out remedial work, and give us the information we or the ADR provider reasonably ask for. We will not start court proceedings while this is going on (see clause 16.3). If the ADR provider makes a decision and you accept it, it will be binding on both of us and we will carry out any remedy within the time it sets. If you do not accept it, you can still take court action. Once the process has finished, you must pay any amount that is still due within 14 days, after taking account of any refund, price reduction or other remedy.

16. Dispute Resolution

16.1If at any time a dispute arises that cannot be resolved through our complaints process and it relates to the sale and installation of a renewable energy system, you can escalate it to Green Homes Dispute Resolution as described in clause 2.4. If it relates to an MCS certified installation, you can complain to MCS as described in clause 2.5.

16.2Other disputes, including EV charge points and remote monitoring. Complaints about EV charge points, remote monitoring and anything else not covered by clause 16.1 follow our complaints process in clause 15. If we cannot resolve a complaint, we will tell you in writing the name and website of an appropriate alternative dispute resolution (ADR) provider and whether we are willing to use it. You can also get free advice from the Citizens Advice consumer service on 0808 223 1133, or seek legal advice or take court action.

16.3Court action. We will not take court action against you without first trying to resolve the dispute in line with the process in clauses 15.1 to 16.2.

Schedule 1 Model Cancellation Form

(Complete and return this form only if you wish to withdraw from the contract)

To Happy Energy Solutions Ltd, Unit 1, New Road, Perranporth, Cornwall, TR6 0DL. Tel: 01483 981688 email: info@happyenergy.co.uk

I/We [*] hereby give notice that I/We [*] cancel my/our [*] contract of sale of the following goods [*]/for the supply of the following service [*],

Ordered on [*]/received on [*], Name of consumer(s),

Address of consumer(s),

Signature of consumer(s) (only if this form is notified on paper),

Date

[*] Delete as appropriate

Please also tell us which contract you are cancelling: the Assessment Contract or the Installation Contract.

© Crown copyright 2013.

Schedule 2 Request to start work during the cancellation period

You have the right to cancel within the cancellation periods set out in clause 4.4. We will only start work during a cancellation period if you ask us to. You can ask by ticking the early start box in our online booking and quotation system, or by completing and signing this form. Please read the information about your right to cancel (Schedule 1) before you decide. We will give you a copy of your request.

Home Energy Assessment

[ ] I ask Happy Energy Solutions Ltd to start my Initial Assessment and Home Energy Assessment before my 14-day cancellation period ends. I understand that:

(a) if you fully carry out the assessment before the end of the cancellation period, I lose my right to cancel it; and

(b) if I cancel after you have started but before it is finished, I must pay you for what you have done so far, in proportion to the full price.

Pre-Installation Technical Inspection and installation

[ ] I ask Happy Energy Solutions Ltd to start my Pre-Installation Technical Inspection and my installation before my cancellation period ends. I understand that if I cancel during that period after you have started, I may have to pay for the goods and services you have already supplied (including the inspection) and for making good my property, in proportion to the full price agreed. I understand I can still cancel until 14 days after the last goods are delivered.

Reason for starting before the end of the cancellation period (required): Customer request

Customer name: ________________ Signature: ________________ Date: ________________

Version: 2.20, 17 November 2026